SQRD2 Temporary Works Engineering
Structural Quality. Reliable Design.

Temporary Works Design & Independent Checks

BS 5975 aligned deliverables for construction activities: clear calculations, buildable sketches and design certificates.

Temporary Works only Design certificates CAT 2 / CAT 3 checks Site-focused & practical

No free design advice by email. Submit an enquiry with drawings to receive a proposal.

Temporary Works Services

Choose a TW item — submit drawings to receive a proposal.

Formwork & Falsework

Design and checks for walls, slabs, beams, rafts and supporting arrangements.

  • Concrete pressure / spacing / ties
  • Falsework / props layouts
  • Backpropping / reshoring

Platforms & Access

Working platforms and access solutions for site operations.

  • Working platforms (incl. MEWP)
  • Scaffold platforms / birdcages
  • Edge protection interfaces

Propping, Retaining & Stability

Temporary support, restraint and stability checks during construction stages.

  • Temporary propping to walls/cores/frames
  • Retaining / kingpost checks
  • Local strengthening details

Hoists & Temporary Installations

Engineering verification of temporary arrangements linked to construction access.

  • Hoist landing platforms
  • Tie arrangements and local checks
  • Temporary steelwork verification

Independent Checks

Independent check to agreed category (CAT 2 / CAT 3) aligned with project procedures.

  • Concept + calculation review
  • Buildability / assumptions
  • Check certificate (as applicable)

What to send

Fast proposals require clear inputs.

Drawings / sketches

GA / sections / details + any site constraints (access, foundations, limits).

Loads & use

Concrete pour heights/rate (if relevant), imposed loads, plant, wheel loads, etc.

Programme

Required issue date, urgency (standard / fast-track), revision expectations.

Scope boundary

Temporary Works only. If information is insufficient, a Feasibility Review may be proposed first.

Fees & Proposals

Fees are confirmed after drawings and scope review.

How fees are set

Temporary Works fees depend on scope, complexity, risk category (CAT 2 / CAT 3), programme and the quality of information provided. A written proposal is issued once drawings and requirements are reviewed.

Request Temporary Works Design

Complete the form — you’ll receive a proposal once scope is reviewed.

Confidential: information is reviewed only for scoping and delivery.